Office Relocation Checklist: Move Your Business Without Downtime

This office relocation checklist takes a Kenyan business from the decision to move through to the first Monday in the new office. It covers the lease, the move team, IT and internet, staff communication, labelling, the weekend move and the follow-up, so the business keeps running throughout.

Team planning with a floor plan and an office relocation checklist

Quick answer

Start three months out by confirming the lease, the budget and a move coordinator. Order internet early, plan the floor layout and book movers. Label every desk and device by the new floor plan. Move over a weekend, test IT on Sunday and have a support team on site on Monday.

An office move touches every part of a business. Staff need desks, customers need to find you, and systems must be online on the first morning. Without a plan, a move can cost several working days. With one, staff leave on Friday and start work on Monday as if nothing happened. This office relocation checklist sets out that plan step by step.

It suits small offices of five people as well as larger companies across several floors. For bigger moves, our office movers can take on most of the tasks below.

Common problems

Three months before: start your office relocation checklist

  • Confirm the new lease, the start date and any fit-out work the landlord will do.
  • Check the notice period and reinstatement terms in your current lease.
  • Set a budget for the move, fit-out, IT, furniture and contingency.
  • Appoint an internal move coordinator with the time and authority to make decisions.
  • Form a small move team with one person from each department.

How it works

Two months before: plan the space

  • Get the new floor plan and decide where each team will sit.
  • Number every desk, office and meeting room on the plan.
  • Decide what furniture moves, what is sold and what is new.
  • Book movers after a site survey at both offices. Ask for a written plan and a fixed quote.
  • Check the new building's rules on moving hours, loading bays and lift bookings.

Common problems

IT and internet: the most critical part of the office relocation checklist

Internet installation can take weeks, so order it as early as you can. Then work through the rest of the IT list with your IT team or provider.

  • Order internet lines for the new address, with a backup line if possible.
  • Plan the network, data points, Wi-Fi coverage and server or comms room.
  • Check power points for every desk and a UPS for critical equipment.
  • Plan phone numbers and how calls will be routed during the move.
  • Back up all data before the move, and test the backup.
  • Agree who shuts down, moves and restarts servers and network gear.
Office move checklist in action: movers carrying office equipment in Nairobi
Desks, chairs and IT equipment are labelled by the new floor plan before they leave.

People and training

Six weeks before: tell people

  • Tell staff the move date, the new address and what is expected of them.
  • Tell clients, suppliers and partners, with the date the new address takes effect.
  • Update your website, Google Business Profile, email signatures and invoices.
  • Order new signage, business cards and letterheads.
  • Arrange mail forwarding and update your address with banks and authorities.

Businesses should also update their registered office details where required. The Business Registration Service explains how company details are updated in Kenya.

Packing

One month before: packing and labelling

Labelling is what makes the weekend move work. Every item gets a label that matches a desk or room number on the new floor plan.

  1. Give each person crates. First, staff pack their own desk items into labelled crates.
  2. Label furniture. Next, each desk, chair and cabinet gets the new desk or room number.
  3. Label IT. Then every screen, computer, phone and cable bag gets the same number.
  4. Archive files. Move old files to storage or shred them securely.
  5. Clear out. Finally, book junk removal for broken chairs, old printers and clutter.

Our junk removal and storage services help with the last two steps.

Offices and businesses

The office relocation checklist for the final week

  • Confirm the moving schedule, crew size and loading bay bookings at both buildings.
  • Share the floor plan and labelling key with the movers.
  • Remind staff to pack and to take personal valuables home.
  • Confirm the internet line is live at the new office.
  • Arrange access cards and keys for staff at the new building.

Office relocation checklist

Moving weekend

  1. Friday afternoon. First, staff finish packing, and IT backs up and shuts down systems.
  2. Friday evening. Next, movers dismantle workstations and load the trucks by floor.
  3. Saturday. Then the crew unloads, places furniture by the plan and reassembles workstations.
  4. Sunday. IT reconnects and tests every computer, phone and printer.
  5. Sunday evening. Finally, the move coordinator walks the office and checks every desk.

Office relocation checklist

The first Monday

Have the move team and IT support on site from early morning, and keep the office relocation checklist handy for final checks. Staff will find small problems, such as a missing cable, a dead socket or a wobbly chair, and quick fixes keep the whole day productive. Also place simple signs for toilets, kitchens, meeting rooms and fire exits, so nobody has to ask. In addition, welcome staff with a short tour and a note on building rules.

Office relocation checklist

The first month

  • Collect feedback from staff and fix layout or comfort issues.
  • Check that clients and suppliers are using the new address.
  • Hand back the old office in the agreed condition and collect the deposit.
  • Close the move budget and note lessons for next time.

Using this office relocation checklist with movers

A good mover will take over much of this office relocation checklist. For example, they can survey both offices, supply crates, label furniture, dismantle and reassemble workstations, and coordinate with building management. However, decisions about the floor plan, the IT and staff communication stay with you. So share the checklist with your mover, agree who does what and review it together each week.

Moving schools, clinics and shops

The same checklist applies to schools, clinics and shops, with a few changes. Schools move during holidays and need to label classrooms, labs and libraries. Clinics must plan for medical equipment, records and patient notices. Shops need to plan stock counts and opening dates. Our school relocation and commercial movers pages cover these in detail.

Choosing the right moving day

Most offices move over a weekend, but some choose a public holiday weekend for an extra day. However, holiday weekends can mean fewer building staff and slower internet providers. Therefore confirm that the landlord, security and your IT provider will be available. In addition, avoid month-end if your finance team closes the books then, because they need their systems most at that time. In short, pick a date when the business can afford a short pause and the support people are on hand.

Communicating with staff throughout

Staff handle change better when they know what is happening. So share the office relocation checklist with team leaders and give regular updates. For example, send a short note each week with what has been done and what comes next. Before the move, share the new floor plan, parking details, transport routes and building rules. Also explain what each person must pack and by when. Then, on the first Monday, welcome everyone and ask for feedback. As a result, the move feels like a fresh start rather than a disruption.

Offices and businesses

Common office move mistakes

  • Ordering internet too late, so staff cannot work on Monday.
  • No floor plan, so movers guess where desks go.
  • Labels that do not match the new layout.
  • Forgetting to tell clients and update the website.
  • Moving on a weekday and losing a full day of work.

Office relocation budget items people forget

Office moves often go over budget because of small items nobody planned for. For instance, new data points, extra power sockets, blinds, signage, cleaning at both offices, reinstatement works at the old office and overtime for IT staff. Then, if nothing goes wrong, the money is simply saved.

Health and safety on moving day

Moving day involves heavy lifting, trolleys in corridors and cables on the floor. So keep staff out of the way while movers work, mark trip hazards and keep fire exits clear. The Ministry of Labour publishes guidance on workplace safety. A professional mover will bring trolleys, protect floors and lifts, and follow the building's safety rules.

Get help with your office move

If you are planning an office move now, we can survey both sites and send a written plan with a fixed price. We usually move offices over a weekend, so your team is back at work on Monday. Request a moving quote to get started.

A note on moving prices

We do not publish fixed prices, because every move is different. Instead, we assess each move, send a written quote and agree the final price with you, so the figure you agree reflects your real move. If you are working to a budget, tell us early. Then we can suggest options, such as packing some boxes yourself, moving mid-month or sharing a truck on long routes.

Get started

Get your moving quote

Tell us what you are moving and where, and our move coordinator will call you back within one working day to plan it with you.

  • Clear, itemised written quote
  • Packing, transport and setting up from one team
  • Careful crew, padded and wrapped furniture

Prefer to talk? Call +254 184 379 590

We reply within one working day. Or call +254 184 379 590.

Frequently asked questions

How long does it take to plan an office move?

About three months for most offices. Larger offices or moves with fit-out work may need longer.

When is the best time to move an office?

Over a weekend, starting on Friday afternoon, so staff can work in the new office on Monday.

How do movers know where each desk goes?

Every desk, chair and device is labelled with a number that matches the new floor plan.

Who handles the IT during an office move?

Your IT team or provider shuts down, moves and reconnects systems, while movers pack and carry equipment safely.